01 · Start here
How to use this guide
A practical, stage-by-stage guide to building well in India, written by engineers in plain language. Each chapter tells you what to do, what not to do, and how to check the work yourself.
| Symbol | Meaning |
|---|
| Do | Good practice that prevents common defects |
| Don’t | Mistakes we see on Indian sites again and again |
| Check | What an owner can verify on site, without being an engineer |
| Code | The Indian Standard or rule behind the advice |
Numbers quoted from Indian Standards are general requirements. Your approved structural drawings and specifications take priority wherever they say something different.
This is general guidance, not project-specific engineering advice, design approval or certification. When in doubt, ask your structural engineer.
02 · Before you build
Before you buy or build on a plot
Most building problems start with a plot that should not have been bought, or bought without the right checks.
Do
- Have a lawyer check the sale deed and every link document back to the original owner.
- Take an encumbrance certificate covering at least 13 to 30 years.
- In Telangana, check the record of rights on Bhu Bharati (it replaced Dharani in April 2025); in Andhra Pradesh check Adangal and 1-B.
- Confirm the layout is HMDA or DTCP approved, or regularised under LRS.
- Measure the actual road width in front of the plot; it decides setbacks and height.
- Check the master plan land use, and stay clear of lake buffers, nalas, high-tension lines and heritage zones.
Don’t
- Don’t rely on a brochure’s road width or layout map.
- Don’t pay a large advance before title verification.
- Don’t buy a filled-up low-lying plot without budgeting for deeper foundations.
How to check on site
- Survey sketch matches the plot on the ground
- Boundary stones in place and agreed with neighbours
- Property or land tax paid up to date in the seller’s name
03 · Before you build
Approvals and building rules (Telangana and Andhra Pradesh)
Building permission comes before construction. Your architect prepares and submits the drawings; you should understand the rules that shape your building.
| Rule | What it means for you |
|---|
| Front setback (G.O. Ms. 168) | For residential buildings up to 15 m on roads up to 12 m: 1.5 m below 200 sq m plot, 2 m for 200–300 sq m, 3 m from 300 sq m. Wider roads need more. |
| Side and rear setbacks | 100–200 sq m: 1 m each; 200–300 sq m: 1.5 m; 300–500 sq m: 1.5 m sides, 2 m rear. Very small plots need only the front setback. |
| Above 15 m height | A uniform setback of at least 7 m all round, a road of 12 m or more, structural review and fire NOC. |
| High-rise (G.O. Ms. 95, March 2026) | Buildings of 21 m and above are high-rise. 18–21 m on 750–2,000 sq m plots needs TDR. |
| Stilt parking | Parking floors are not counted in the height used for setbacks. |
| 10% mortgage | 10% of the built-up area on the ground or first floor is mortgaged to the authority until completion as approved; small individual houses can be exempt. |
| Rainwater harvesting | Approval plans must show rainwater harvesting pits; larger plots must build them before water connections. |
| Validity | Start within 18 months of permission; it can be revalidated for two more years on payment. |
| How to apply | BuildNow Telangana (replaced TG-bPASS for new applications on 15 December 2025); AP DPMS in Andhra Pradesh. |
Cantonment areas, older HUDA layouts such as Banjara Hills and Jubilee Hills, heritage precincts and lake buffer zones have their own rules.
Rules are amended often. Your architect must confirm every number against the current notification.
Codes Telangana Building Rules 2012 (G.O. Ms. 168) and G.O. Ms. 95 (2026) · NBC 2016 Part 3 (Development control rules)
04 · Before you build
Budget, estimates and quotations
A good quotation is specific. A cheap one is usually vague.
Do
- Ask for an itemised quote (BOQ) taken from your drawings, not just a rate per sq ft.
- Insist on brands, grades and allowances in writing: cement, steel, tiles per sq ft, doors, fittings.
- Compare quotations on the same scope: list what each one includes and excludes.
- Keep 5 to 10% of the budget as a contingency for changes and price rises.
- Ask how GST, approval fees, sump, borewell, compound wall and interiors are handled.
Don’t
- Don’t compare quotations by the rate per sq ft alone; compare the specifications behind them.
- Don’t accept “good quality material” in place of brand names.
- Don’t forget the cost of design, approvals, utilities and interiors.
| Typical cost share (RCC house) | Approx. share |
|---|
| Foundation and RCC structure | about 40–45% |
| Masonry and plaster | about 15% |
| Flooring and tiling | about 10% |
| Doors and windows | about 8–9% |
| Plumbing and sanitary | about 8% |
| Electrical | about 7% |
| Painting and finishing | about 6% |
Shares vary with specification. Use the construction cost calculator in Tools for an estimate.
05 · Before you build
Choosing a contractor and the contract
Your contract protects you only if it is specific.
Do
- Visit two of the contractor’s ongoing sites without notice.
- Ask who will supervise your site daily, and whether an engineer checks the work at every stage.
- Put in the contract: scope, drawings referred to, specifications and brands, price, payment stages, schedule, delay penalty, variation procedure, warranty and defect liability period.
- Link every payment to a finished, checked stage.
- Agree how changes (variations) are priced and approved, in writing, before work.
Don’t
- Don’t pay a large advance before work starts.
- Don’t sign a contract with no drawings or specification attached.
- Don’t accept “we will decide steel at site”.
How to check on site
- Contractor’s GST registration and past client references
- Labour insurance and site safety arrangements
- A named site engineer and a single point of contact
06 · Ground and foundations
Soil investigation and foundations
The soil decides the foundation; the foundation decides whether your walls crack in ten years.
Do
- Get a soil investigation through a geotechnical lab before the structural design, at least for G+2 and above, filled plots and black cotton soil.
- Ask for safe bearing capacity, soil profile and water table in the report.
- At excavation, check that the soil at the designed depth matches the report; tell your engineer if it doesn’t.
- Black cotton soil (common around Vijayawada and Guntur) swells when wet and shrinks when dry: follow the special foundation your engineer designs, such as under-reamed piles.
Don’t
- Don’t copy a neighbour’s foundation depth.
- Don’t build footings on filled soil, garbage or loose earth.
- Don’t let rainwater stand in open foundation pits for days.
| Foundation | Typically used for |
|---|
| Isolated footing | Columns on firm soil or murrum |
| Combined footing | Columns close together or near the boundary |
| Raft | Weak soil or heavy loads, to spread the load |
| Pile | Deep soft soil, filled plots, tall buildings |
| Under-reamed pile | Expansive black cotton soil |
Codes IS 1904 (Design and construction of foundations in soils) · IS 2911 (Pile foundations) · IS 1893 (Part 1):2016 – Hyderabad Zone II, Vijayawada Zone III
07 · Ground and foundations
Stage 1: Site setup and setting out
Mistakes in setting out are carried into every floor above.
Do
- Fix permanent reference pillars and a benchmark level outside the work area.
- Mark centre lines from the drawing, not from the plot boundary.
- Check diagonals of every rectangle: equal diagonals mean square corners.
- Store cement off the floor in a dry shed, steel on supports above ground, and sand and aggregate on a clean hard base.
Don’t
- Don’t mark from a single corner without cross-checking diagonals.
- Don’t stack cement more than 10 bags high or against outside walls.
How to check on site
- Centre-line marking agrees with the drawing dimensions
- Diagonal measurements match within a few millimetres
- Cement stored 150–200 mm above the floor, not more than 10 bags high
Codes IS 4082:1996 (Stacking and storage of construction materials at site)
08 · Ground and foundations
Stage 2: Excavation and PCC
Dig to the designed depth, on firm soil, and keep the pits clean and dry.
Do
- Excavate to the depth and size on the structural drawing.
- Ram and level the bottom; remove loose soil and roots.
- Lay PCC (lean concrete, typically 1:4:8 or as specified) to give a clean, level base for the footing.
- Shore or slope deep excavations and keep spoil away from the edges.
Don’t
- Don’t place footing steel directly on soil.
- Don’t let workers enter deep unsupported pits.
- Don’t backfill before the footing and column stubs are inspected.
How to check on site
- Pit depth measured from the benchmark
- Firm, dry bottom with no water or loose soil
- PCC level and of the specified thickness
Codes IS 3764 (Excavation work – safety code)
09 · Ground and foundations
Stage 3: Reinforcement (steel)
Steel only works if it is the right size, in the right place, with the right cover, and properly lapped and tied.
Do
- Use the grade on the drawing (Fe500D gives more elongation, 16% against 12% for Fe500, which helps in earthquakes).
- Cut and bend steel from a bar bending schedule (BBS) made from the structural drawings.
- Hold cover with concrete or PVC cover blocks: typically 50 mm footings, 40 mm columns, 20–30 mm slabs and beams.
- Lap bars only where the drawing allows; minimum lap in tension is the development length or 30 bar diameters, and in compression 24 diameters.
- Stagger laps: not more than half the bars should be lapped at one section.
- Bend stirrup ends at 135° with long tails into the core, as earthquake detailing requires.
- Tie every crossing with binding wire and support top steel on chairs.
Don’t
- Don’t use bricks or stones as cover blocks.
- Don’t lap all column bars at the same level or at the beam-column joint.
- Don’t use 90° hooks on stirrups where 135° is detailed.
- Don’t heat-bend TMT bars.
- Don’t walk on or load fixed steel before the pour.
How to check on site
- Bar sizes and counts match the drawing, member by member
- Cover blocks present, at the right thickness
- Stirrup spacing closer near joints, as drawn
- Laps staggered and of correct length
- Loose rust brushed off; no flaky rust
| Bar dia (mm) | Weight (kg/m) = D²/162 |
|---|
| 8 | 0.395 |
| 10 | 0.617 |
| 12 | 0.889 |
| 16 | 1.580 |
| 20 | 2.469 |
| 25 | 3.858 |
Codes IS 456:2000 cl. 26 (Detailing: cover, laps, spacing) · IS 13920:2016 (Ductile detailing) · IS 1786:2008 (TMT bars) · IS 2502 (Bending and fixing of bars) · SP 34 (Detailing handbook)
10 · Ground and foundations
Stage 4: Formwork (shuttering) and props
Formwork shapes the concrete and carries it until it can carry itself.
Do
- Use rigid, clean, oiled shuttering with tight joints so slurry does not leak.
- Support props on firm ground or planks; brace them both ways.
- Check levels and slopes of slab shuttering before steel is fixed.
- Give cantilevers and long spans a slight upward camber if the engineer specifies it.
Don’t
- Don’t use bent, broken props or loose bricks under props.
- Don’t remove props early to reuse them on the next floor.
- Don’t load fresh slabs with bricks or cement bags.
| Formwork to remove (OPC, IS 456) | Minimum time |
|---|
| Vertical faces of columns, walls, beams | 16–24 hours |
| Slab soffit (props left under) | 3 days |
| Beam soffit (props left under) | 7 days |
| Props under slabs up to 4.5 m span | 7 days |
| Props under slabs over 4.5 m span | 14 days |
| Props under beams up to 6 m span | 14 days |
| Props under beams over 6 m span | 21 days |
Times are for ordinary Portland cement in normal weather; blended cements such as PPC and cold weather need longer.
Codes IS 456:2000 cl. 11.3 (Stripping time)
11 · Ground and foundations
Stage 5: Concreting
Good concrete is about the right mix, the right water, full compaction and proper curing.
Do
- Use the grade specified; M20 is the minimum for reinforced concrete.
- Prefer ready-mix concrete (RMC) from a plant with a delivery ticket for every truck.
- Check slump on every batch; typical ranges are about 25–75 mm for lightly reinforced slabs, beams and columns and 50–100 mm for heavily reinforced sections.
- Compact with a needle vibrator; withdraw it slowly to avoid voids.
- Cast cubes: one sample (3 cubes) for 1–5 m³, two for 6–15 m³, three for 16–30 m³, four for 31–50 m³, plus one more for every additional 50 m³.
- Place concrete within the time the supplier allows and pour slabs in one continuous operation.
Don’t
- Don’t add water at site to make concrete flow.
- Don’t drop concrete from a height that makes it segregate.
- Don’t over-vibrate till cement slurry floats on top.
- Don’t leave a cold joint in the middle of a beam or slab without the engineer’s approval.
How to check on site
- Delivery ticket shows grade, time of batching and quantity
- Slump measured and recorded
- Cubes cast, labelled and cured
- No honeycombing visible after de-shuttering
Acceptance of concrete is judged on 28-day cube strength against IS 456 Table 11. Your engineer reviews the results.
Codes IS 456:2000 cl. 6, 7, 15, 16 · IS 10262 (Mix proportioning) · IS 4926 (Ready-mixed concrete) · IS 516 and IS 1199 (Testing of concrete)
12 · Ground and foundations
Stage 6: Curing
Concrete gains strength only while it stays wet. Curing is not optional.
Do
- Start curing as soon as the surface is hard enough not to be damaged.
- Keep slabs ponded or covered with wet hessian; wrap columns with wet hessian or use curing compound.
- Cure at least 7 days for OPC concrete and at least 10 days for blended cements (PPC) or in hot, dry weather; 14 days is better in summer.
Don’t
- Don’t sprinkle water once a day and call it curing.
- Don’t let surfaces dry and wet repeatedly.
- Don’t skip curing on columns because they are vertical.
How to check on site
- Slab ponds or wet coverings visible every day
- Curing log with dates
- Curing compound only where approved
Codes IS 456:2000 cl. 13.5 (Curing)
14 · Ground and foundations
Stage 8: Beams and slabs
The slab pour is the single most important day on site. Inspect before it, not after.
Do
- Lay electrical conduits, fan hooks and sleeves for plumbing in the slab before the pour.
- Check top and bottom steel, cover, chairs and extra bars at openings.
- Check shuttering levels, props and bracing.
- Have the engineer sign off the hold-point checklist before concrete arrives.
Don’t
- Don’t cut slab steel later to pass pipes.
- Don’t pour with workers walking on and flattening the top steel.
- Don’t use the fresh slab to store materials.
How to check on site
- Conduits in place and tied
- Top steel on chairs, not pressed down
- Slab thickness checked at several points during pour
- Sunshades and cantilevers have top steel anchored back into the slab or beam
15 · Walls and services
Stage 9: Masonry (bricks and blocks)
Walls should be straight, plumb, well bonded and tied to the frame.
Do
- Use bricks that meet IS 1077: water absorption not more than 20% (up to class 12.5) and sound, sharp-edged and well burnt.
- Soak clay bricks before laying (AAC blocks only need damping).
- Keep joints about 10 mm and fully filled; stagger vertical joints.
- Raise walls about 1 to 1.5 m a day (CBRI recommends 1.2 m) and cure masonry for 7 days.
- Use 1:6 mortar for full-brick walls and richer mortar, such as 1:4, for half-brick walls, or as specified.
- Provide lintels over openings and fix chicken mesh across brick–concrete junctions before plastering.
Don’t
- Don’t use brickbats to fill gaps.
- Don’t build tall half-brick walls without a band or tie.
- Don’t pack the top gap under a beam on the same day; fill it later.
How to check on site
- Walls plumb and in line
- Joints full, about 10 mm
- Lintels bearing at least as specified on each side
Codes IS 1077:1992 (Clay bricks) · IS 2212:1991 (Brickwork) · IS 2185 (Part 3) (AAC blocks) · IS 4326 (Earthquake-resistant masonry bands)
16 · Walls and services
Stage 10: Electrical and plumbing rough-in
Services are hidden in walls and floors. Test everything before it is covered.
Do
- Fix all points from an electrical and plumbing layout before plastering.
- Use ISI-marked wires and pipes of the specified grade (CPVC for hot and cold water, uPVC for drainage).
- Pressure-test water lines and leave the test on for the time specified before covering.
- Provide proper earthing to IS 3043 and an RCCB (residual current device, typically 30 mA) on circuits as specified.
- Use a licensed electrical contractor, as the CEA safety regulations require.
Don’t
- Don’t chase deep horizontal grooves in thin walls.
- Don’t join wires inside walls without junction boxes.
- Don’t use water or gas pipes as earth electrodes.
How to check on site
- Pressure gauge holds during the test
- Continuity and insulation tested before plaster
- Separate circuits for heavy loads such as AC and geyser
Codes IS 732 (Electrical wiring) · IS 3043 (Earthing) · IS 694 (Cables) · IS 12640 (RCCB) · IS 15778 (CPVC pipes) · IS 4985 and IS 13592 (uPVC pipes) · CEA Safety Regulations 2023
17 · Finishes
Stage 11: Plastering
Plaster protects walls and gives a true surface for paint and tiles.
Do
- Rake masonry joints and wet the surface before plastering.
- Use single-coat plaster of about 10–15 mm inside and two coats outside, with a total not exceeding about 20 mm.
- Fix chicken mesh over brick–concrete junctions and over service chases.
- Cure plaster for about 7 days.
- Use groove bands at junctions of different materials to control cracking.
Don’t
- Don’t apply one very thick coat to hide uneven walls.
- Don’t plaster over wet, dusty or oily surfaces.
- Don’t let plaster dry in the sun without curing.
How to check on site
- Surface checked with a straight edge
- No hollow sound when tapped
- Corners and edges straight
Codes IS 1661:1972 (Cement and cement-lime plaster)
18 · Finishes
Stage 12: Waterproofing
Most leaks come from skipped steps and skipped tests, not from bad products.
Do
- Waterproof bathroom floors and the lower walls, with extra height in the shower area.
- Round the floor–wall junctions (coving) before coating.
- Pond-test wet areas and terraces for 48 hours before tiling.
- Give terraces a proper slope to outlets and protect the membrane.
- Treat sumps and water tanks as water-retaining structures, as designed.
Don’t
- Don’t tile a bathroom without a pond test.
- Don’t puncture the waterproofing with tile fixing or pipes later.
- Don’t block terrace outlets with debris.
How to check on site
- Water level steady after 48 hours
- No damp patches below
- Outlets clear and at the lowest point
Codes IS 2645 (Integral waterproofing compounds) · IS 3370 (Water-retaining structures)
19 · Finishes
Stage 13: Flooring and tiling
Floors should be level, hollow-free and laid with the right joints.
Do
- Check the base for level and slope before tiling, especially toward bathroom drains.
- Use tile adhesive or a proper mortar bed as specified, with full coverage.
- Keep spacer joints and fill them with suitable grout or epoxy.
- Leave movement joints in large floors and at junctions.
Don’t
- Don’t lay tiles with spot dabs of mortar (they sound hollow and crack).
- Don’t walk on fresh tiles for the setting time.
- Don’t mix tile batches with different shade codes.
How to check on site
- Tap test: no hollow sound
- Level checked with a spirit level
- Bathroom floors drain to the outlet
Codes IS 15622 (Ceramic tiles)
20 · Finishes
Stage 14: Doors, windows and grills
Openings must be square, plumb and sealed against water.
Do
- Fix frames plumb and square, with holdfasts as specified.
- Seal gaps between window frames and walls with sealant to stop seepage.
- Fit drip moulds or sunshades above windows exposed to rain.
Don’t
- Don’t fix frames before the opening is checked for size and level.
- Don’t leave gaps around windows to be filled only with plaster.
How to check on site
- Doors close smoothly without rubbing
- Window joints sealed inside and out
- Hardware from the specified brand
21 · Finishes
Stage 15: Painting
A good paint job depends on dry walls and proper preparation.
Do
- Let plaster dry fully before painting.
- Inside: typically two coats of putty, one primer and two coats of emulsion, or as the manufacturer specifies.
- Outside: primer and two coats of exterior weatherproof paint.
- Treat damp patches and cracks before painting.
Don’t
- Don’t paint over damp or salty walls (efflorescence).
- Don’t thin paint more than the manufacturer allows.
How to check on site
- Uniform shade in daylight
- No patches, brush marks or peeling
- Paint brand and product as specified
22 · Finishes
Stage 16: Sump, septic tank, rainwater harvesting and external works
External works are often rushed at the end. They are part of the building.
Do
- Build sumps as water-tight structures and test them before backfilling.
- Size the septic tank for the number of users as per the standard.
- Build a working rainwater harvesting pit with filter media, not one that exists only on paper.
- Give compound walls a proper foundation and expansion gaps on long runs.
Don’t
- Don’t place the septic tank close to the sump or borewell.
- Don’t connect rainwater pipes to the sewer line.
How to check on site
- Sump holds water without drop
- Rainwater pipes lead to the recharge pit
- Septic tank inlet and outlet levels correct
Codes IS 2470 (Septic tanks) · IS 15797:2008 (Rooftop rainwater harvesting) · IS 3370
23 · Finishes
Stage 17: Handover and snagging
Don’t accept the keys until the snag list is closed.
Do
- Walk through every room with a written snag list.
- Test every switch, socket, tap, flush and drain.
- Collect as-built drawings showing pipes and cables, warranties, test reports and invoices.
- Agree the defect liability period in writing.
Don’t
- Don’t release the final payment before snags are closed.
- Don’t accept verbal warranties.
How to check on site
- All doors, windows and locks work
- No leaks after running all taps
- Electrical test report and earthing values handed over
24 · Materials
Materials: what to check on delivery
Most bad materials can be caught at the gate. Check before you accept.
| Material | Check on delivery | Code |
|---|
| Cement | ISI mark, grade, manufacturing week (use fresh stock), no lumps; store dry, off the floor | IS 269 (OPC), IS 1489 (PPC), IS 4082 |
| TMT steel | Brand and grade rolled on the bar, ISI mark, test certificate; weight check against D²/162 | IS 1786 |
| Sand (river or M-sand) | Clean, free of silt, clay and organic matter; correct grading; M-sand from a known plant | IS 383 |
| Aggregate | Hard, angular, clean, of the specified size (usually 20 mm and 10 mm) | IS 383 |
| Water | Clean, potable-quality water for mixing and curing | IS 456 cl. 5.4 |
| Clay bricks | Uniform size, sharp edges, ringing sound, absorption ≤ 20% (class up to 12.5) | IS 1077 |
| AAC blocks | Size and density as specified; laid with thin-bed mortar | IS 2185 (Part 3) |
| Ready-mix concrete | Delivery ticket: grade, batching time, quantity; slump test at site | IS 4926 |
| Plywood | IS 710 (BWP/marine) for wet areas; IS 303 (BWR/MR) for dry areas; check the stamp | IS 710, IS 303 |
| Pipes | ISI mark, correct class and type for water or drainage | IS 15778, IS 4985, IS 13592 |
| Wires and switches | ISI mark, correct size for the load, reputed brand | IS 694, IS 732 |
| Tiles | Same batch and shade code, size and flatness, no chips | IS 15622 |
25 · Quick reference
Acceptance criteria at a glance
Key numbers to check work against. Always follow your approved drawings where they differ.
| Item | Typical requirement | Source |
|---|
| Minimum grade of reinforced concrete | M20 | IS 456 cl. 6.1 |
| Nominal cover (typical) | 50 mm footings, 40 mm columns, 20–30 mm slabs and beams by exposure | IS 456 cl. 26.4 |
| Slump (typical ranges) | 25–75 mm lightly reinforced; 50–100 mm heavily reinforced | IS 456 cl. 7 |
| Cube sampling | 1 sample per 1–5 m³; 2 for 6–15; 3 for 16–30; 4 for 31–50; +1 per extra 50 m³ | IS 456 cl. 15.2.2 |
| Cube acceptance | 28-day results judged against IS 456 Table 11 by your engineer | IS 456 cl. 16 |
| Lap length | Tension: Ld or 30 diameters, whichever greater; compression: 24 diameters minimum | IS 456 cl. 26.2.5 |
| Curing | 7 days OPC; 10 days blended cement or hot, dry weather | IS 456 cl. 13.5 |
| Props under slabs | 7 days up to 4.5 m span; 14 days beyond (OPC) | IS 456 cl. 11.3 |
| Steel elongation | Fe500: 12% min; Fe500D: 16% min | IS 1786 |
| Clay brick water absorption | ≤ 20% by weight up to class 12.5 | IS 1077 |
| Cement stack | Not more than 10 bags high, 150–200 mm above floor | IS 4082 |
| Masonry per day | About 1–1.5 m height (CBRI recommends 1.2 m) | CBRI good practice; IS 2212 |
| Plaster thickness | Single coat 10–15 mm; two coats ≤ 20 mm total | IS 1661 |
| Residential stair | Riser ≤ 190 mm; tread ≥ 250 mm | NBC 2016 Part 3 |
| RCCB sensitivity | Typically 30 mA for protection against shock | IS 12640; CEA regulations |
| Wet-area pond test | 48 hours before tiling | Good practice |
26 · Quick reference
The 40 most common construction mistakes
Every one of these is cheap to prevent and expensive to repair.
| # | Mistake | Do this instead |
|---|
| 1 | No soil test | Get a soil report before the structural design |
| 2 | Copying a neighbour’s foundation | Build the foundation your engineer designed for your soil |
| 3 | Building without structural drawings | Appoint a structural engineer; build only from drawings |
| 4 | Changing the plan on site | Freeze the design; route changes through the designer |
| 5 | Vague quotation | Insist on an itemised BOQ with brands |
| 6 | Large advance payment | Pay only for finished, checked stages |
| 7 | Cement stored on the floor | Store on planks, 150–200 mm up, in a dry shed |
| 8 | Using old or lumpy cement | Check the manufacturing week; reject lumps |
| 9 | Dirty or silty sand | Use clean, graded sand or M-sand from a known plant |
| 10 | Bricks as cover blocks | Use proper concrete or PVC cover blocks |
| 11 | Too little cover | Hold the cover on the drawing; it stops rust |
| 12 | All laps at one level | Stagger laps as detailed |
| 13 | 90° stirrup hooks | Use 135° hooks with long tails |
| 14 | Wide stirrup spacing near joints | Follow the closer spacing near beam-column joints |
| 15 | Adding water to concrete at site | Use the right mix and admixture instead |
| 16 | No vibrator | Compact with a needle vibrator |
| 17 | No cube tests | Cast cubes for every pour |
| 18 | Poor curing | Cure 7–14 days, keeping surfaces continuously wet |
| 19 | Removing props early | Follow IS 456 stripping times |
| 20 | Loading a fresh slab | Keep materials off new slabs |
| 21 | Cutting slab steel for pipes | Place sleeves and conduits before the pour |
| 22 | Weak backfill | Compact good soil in layers |
| 23 | Skipping anti-termite treatment | Treat soil before the plinth |
| 24 | Unsoaked bricks | Soak clay bricks before laying |
| 25 | Thick mortar joints and brickbats | Keep 10 mm joints and full bricks |
| 26 | Raising walls too high in a day | Limit height per day and cure |
| 27 | No chicken mesh at junctions | Fix mesh across brick–concrete joints |
| 28 | Deep horizontal wall chases | Plan services; chase carefully or use surface conduits |
| 29 | No pressure test on pipes | Test before plastering |
| 30 | Improper earthing | Earth to IS 3043 with an RCCB |
| 31 | One thick plaster coat | Two coats where thickness is high |
| 32 | Tiling without pond test | Pond-test 48 hours first |
| 33 | Flat terrace without slope | Slope to outlets and waterproof |
| 34 | Spot-fixed tiles | Full-bed adhesive or mortar |
| 35 | Window gaps filled with plaster only | Seal with sealant |
| 36 | Painting damp walls | Let walls dry; treat dampness first |
| 37 | Septic tank near sump or borewell | Keep the separation required |
| 38 | Fake rainwater pit | Build a working recharge pit |
| 39 | No safety helmets or edge protection | Enforce PPE and barriers |
| 40 | Accepting keys without a snag list | Close every snag first |
27 · Quick reference
Cracks, leaks and dampness
Most cracks are harmless. A few are warnings. Width matters: below 0.1 mm hairline, 0.1–1 mm fine, 1–5 mm moderate, above 5 mm severe.
| Crack or symptom | Usual cause | Worry | What to do |
|---|
| Hairline map cracks in plaster | Plaster dried too fast | Low | Fill and repaint |
| Vertical crack at column–wall junction | Different materials move differently | Low | Chicken mesh, re-plaster |
| Horizontal crack below roof slab | Roof slab expands in the sun | Watch | Cool roof, flexible sealant |
| Diagonal cracks at window corners | Missing lintel or sill band, stress at openings | Watch | Check lintel; stitch and seal |
| Stepped diagonal cracks in walls | Foundation settlement | Serious | Structural assessment; monitor width |
| Cracks in beams, columns or slab | Overload, poor design or rusting steel | Serious | Stop loading; call a structural engineer |
| Rust stains, spalling concrete | Steel corroding: low cover or leaks | Serious | Repair with rust treatment and polymer mortar; fix the leak |
| Damp patch below a bathroom | Failed waterproofing or a leaking joint | Watch | Trace the leak; re-waterproof |
| White salt on walls (efflorescence) | Moisture carrying salts from bricks or soil | Low | Remove moisture source; brush off; treat before painting |
28 · Quick reference
Safety on site
A safe site is a well-run site.
Do
- Helmets, safety shoes and gloves for everyone on site; harnesses for work at height.
- Edge protection around slab edges, stair openings and lift shafts.
- Stable scaffolding on firm base plates, with toe boards and handrails.
- Shoring or sloping for deep excavations; keep spoil and materials away from the edge.
- Temporary power through a distribution board with an RCCB; no bare wires.
- First-aid box and an emergency contact list on site.
Don’t
- Don’t let children or visitors walk around the site.
- Don’t climb on shuttering props or use unstable ladders.
Codes NBC 2016 Part 7 (Construction management, practices and safety) · IS 3696 (Scaffolds and ladders) · IS 3764 (Excavation safety)
29 · Quick reference
Building in monsoon and summer
Plan the calendar around the weather.
Do
- Start excavation and foundations between January and May so the plinth is done before the monsoon.
- In summer: cure longer, pour in the cooler hours, keep aggregates shaded and wet.
- In the monsoon: cover cement and fresh concrete, drain pits quickly and avoid pouring in heavy rain.
Don’t
- Don’t leave foundation pits open through the rains.
- Don’t store cement in the open in any season.
30 · Larger buildings
Large residential and commercial buildings
Bigger buildings bring more systems and more approvals.
Do
- Use ready-mix concrete with a pump and a documented quality plan.
- Coordinate structure, MEP, fire and lift drawings before construction starts.
- Buildings above 15 m need a fire NOC and stricter setbacks; high-rise starts at 21 m in Telangana.
- Plan stilt parking, lifts, generator, STP (where required) and solar early.
- Consider pre-engineered steel for warehouses and large-span sheds.
Don’t
- Don’t start construction before all approvals and NOCs are in hand.
- Don’t treat fire safety as a finishing item.
Codes NBC 2016 Part 4 (Fire and life safety) · NBC 2016 Part 8 and Part 9 (Building services, plumbing) · IS 800:2007 (Steel)
31 · Reference
Telugu–Hindi–English glossary
Site words in three languages.
| English | Telugu | Say it | Hindi | Say it | Meaning |
|---|
| Footing | పునాది | punaadi | नींव | neenv | Base that carries the building into the soil |
| Column | స్తంభం / పిల్లర్ | stambham | स्तंभ / कॉलम | stambh | Vertical member carrying load |
| Beam | దూలం | doolam | धरन / बीम | dharan | Horizontal member carrying the slab |
| Slab, roof | పైకప్పు | paikappu | छत / लिंटर | chhat | Concrete floor or roof |
| Shuttering | సెంట్రింగ్ | centring | सेंटरिंग / शटरिंग | centring | Temporary formwork |
| Lintel | లింటెల్ | lintel | लिंटल | lintel | Beam over an opening |
| Sunshade | సన్షేడ్ / చజ్జా | chajja | छज्जा | chhajja | Projection over windows |
| Brick | ఇటుక | ituka | ईंट | eent | Wall unit |
| Sand | ఇసుక | isuka | रेत / बालू | ret | For mortar, plaster, concrete |
| Cement | సిమెంట్ | siment | सीमेंट | seement | Binder for concrete, mortar and plaster |
| Steel bars | కడ్డీలు | kaddeelu | सरिया | sariya | Reinforcement (TMT bars) |
| Curing | క్యూరింగ్ | curing | तराई | taraai | Keeping concrete wet so it gains strength |
| Plaster | ప్లాస్టరింగ్ | plastering | पलस्तर | palastar | Cement coating on walls |
| Compound wall | ప్రహరీ గోడ | prahari goda | चारदीवारी | chaardeewari | Boundary wall |
| Staircase | మెట్లు | metlu | सीढ़ी | seedhi | Stairs |
| Square yard | గజం | gajam | गज | gaj | 9 sq ft |
| Mason in charge | మేస్త్రి | mestri | मिस्त्री | mistri | Leads the masons |
| Ground-breaking | భూమి పూజ | bhoomi pooja | भूमि पूजन | bhoomi poojan | Ceremony before excavation |
| House-warming | గృహప్రవేశం | gruhapravesam | गृह प्रवेश | griha pravesh | Ceremony before moving in |
32 · Reference
Indian Standards and rules referred to
The codes behind this guide. Buy the current editions from the Bureau of Indian Standards.
| Code | Title | Used for |
|---|
| IS 456:2000 | Plain and reinforced concrete – code of practice | Concrete, cover, curing, stripping, testing |
| IS 1893 (Part 1):2016 | Criteria for earthquake resistant design – general provisions and buildings | Seismic zones and earthquake loads |
| IS 13920:2016 | Ductile design and detailing of RC structures subjected to seismic forces | Hooks, confinement, laps |
| IS 875 | Design loads for buildings and structures | Dead, live, wind loads |
| IS 800:2007 | General construction in steel | Steel structures, PEB |
| IS 1786:2008 | High strength deformed steel bars and wires | TMT bars |
| IS 269 / IS 1489 | Ordinary Portland cement / Portland pozzolana cement | Cement |
| IS 383 | Coarse and fine aggregate for concrete | Sand and aggregate |
| IS 10262 | Concrete mix proportioning – guidelines | Mix design |
| IS 4926 | Ready-mixed concrete – code of practice | RMC |
| IS 516 / IS 1199 | Methods of tests for strength / sampling and analysis of concrete | Cube and slump tests |
| IS 2502 and SP 34 | Bending and fixing of bars / handbook on reinforcement detailing | BBS and detailing |
| IS 1904 / IS 2911 | Foundations in soils / pile foundations | Foundations |
| IS 1077:1992 | Common burnt clay building bricks | Bricks |
| IS 2185 (Part 3) | Autoclaved cellular (aerated) concrete blocks | AAC blocks |
| IS 2212:1991 | Code of practice for brickwork | Masonry |
| IS 4326 | Earthquake resistant design and construction of buildings | Bands in masonry |
| IS 1661:1972 | Cement and cement-lime plaster finishes | Plaster |
| IS 2645 | Integral waterproofing compounds | Waterproofing |
| IS 3370 | Concrete structures for storage of liquids | Sumps and tanks |
| IS 2470 | Installation of septic tanks | Septic tanks |
| IS 15797:2008 | Roof top rainwater harvesting – guidelines | RWH |
| IS 6313 (Part 2) | Anti-termite measures – pre-constructional chemical treatment | Termite protection |
| IS 4082:1996 | Stacking and storage of construction materials at site | Site stores |
| IS 732 / IS 3043 / IS 694 / IS 12640 | Wiring / earthing / cables / RCCBs | Electrical |
| IS 15778 / IS 4985 / IS 13592 | CPVC pipes / uPVC water pipes / uPVC soil and waste pipes | Plumbing |
| IS 15622 | Pressed ceramic tiles | Tiles |
| IS 303 / IS 710 | Plywood for general purposes / marine plywood | Joinery |
| IS 3696 / IS 3764 | Scaffolds and ladders / excavation safety | Safety |
| NBC 2016 | National Building Code of India (Parts 3, 4, 6, 7, 8, 9) | Planning, fire, structure, safety, services |
| G.O. Ms. 168 and G.O. Ms. 95 | Telangana Building Rules 2012 and 2026 amendments | Setbacks, height, mortgage, TDR |